Foundation at Kusa Addition

The 2 most important parts of a building are the foundation and the roof. If the foundation is put in properly, and the roof is built and maintained well, the building can last for hundreds of years.











The foundation consists of a concrete footer, in this case 24"x10" with two 1/2" horizontal iron rebar. The footers support the foundation walls which are normally made of poured concrete or concrete block. We chose concrete block on this project to match the existing house. The block is covered with a waterproof membrane to keep moisture out of the basement or crawlspace.









A perimeter drain system consisting of a perforated pipe covered with gravel is placed at the base of the foundation wall to carry away any water at the footer.



It is also important that when the foundation walls are back filled and graded that the ground slopes away from the house, which can be difficult on lots of this type.

Kusa Room Addition

This week we broke ground
on Kusa Lane in Hide-A-Way Hills. The sloped lot is typical for H-A-H and creates interesting if not difficult building conditions. Our excavator is very experienced working on these types of home sites and was able to create an area to build on that will minimise the effect of the water from the hillside above.


Floor Tile in Lakefront Bathroom



The drywall on our lakefront remodel is finished, sanded, and primed. Today we installed the tile floor. The owners chose a 1" hexagon tile that we applied over 1/4 " concrete backer board.

Lakefront Bathroom Remodel Continues


The work continues at our lake front remodel. A new 34"x 60" fiberglass shower has been installed to replace the old 32"x 32" unit. These showers are designed to fit in bathrooms that have a standard 5' tub, but worked out great in our new design.


The walls have been insulated and drywalled and the first 2 coats of joint compound have been applied.




Bathroom Remodel on a Lakefront Cabin

This week we started work on a Bathroom Remodel on a Lakefront Cabin in Hide-A-Way Hills. The owners requested a larger shower along with adding a laundry. Because of the age and original use of the cabin, there is not a current laundry. Cabins which are missing laundry facilities are not uncommon in HAH. This is the second laundry addition since March.























The pictures taken at the beginning of the project display the old fixtures , paneling, and the original use of space. By expanding the bath area into a small hallway and reconfiguring the two closets, we were able to create an area to add a stackable washer-dryer.


In our demo, we thought we were removing the original bathroom in the cabin. However, in talking with a long time member of Hide-A-Way Hills, and previous owner of the cabin, I learned he had upgraded this bathroom many years ago. I had never heard of such an item, but it appears the cabin was built with a destroy-let, a toilet without water that used propane burners to incinerate the waste.

Bathroom Remodel on Tillamook

After the kitchen and living room were completed on Tillamook the customers decided to revamp the bath as well.



We chose a 12"x 12" ceramic tile for the floor.




6"x6" ceramic tile was used on the vanity top with a 3"x12" back splash and a 6" rounded trim edge. We reused the existing sink but dressed it up with a new faucet.




To tie the room together we continued the same 6"x6" tile around the existing tub-shower.


To find out what projects we can do to revitalise your home contact me for a free design estimate.