
Showing posts with label Framing. Show all posts
Showing posts with label Framing. Show all posts
Framing the Golf Course Restrooms
Over the Memorial Say weekend I gathered some volunteers to help me frame the new Restrooms for the Hide-A-Way Hills Golf Course.


Framing Begins on Kusa Room Addition
The framing begins at our Kusa Room Addition. 2x10 floor joists are installed 16" on center to support the 3/4 " Advantech flooring panels. Advantech sub floors are both stronger and more weather resistant than either plywood or osb floors, and offer a 50 year warranty.
The floor panels are glued and nailed to the joists to avoid floor squeaks.
The floor panels are glued and nailed to the joists to avoid floor squeaks.Back Deck
Subscribe to:
Posts (Atom)




