The old 5'x8' deck was in pretty bad shape and needed to be removed.
After the old deck was removed we begin construction of the new 16'x22' multi-level deck.
Holes for concrete foundations are dug 32" below grade, to prevent movement during freezing and thawing. 4x4 support posts are then attatched using galvanised brackets.
2x8 joists are installed 16" on center over twin 2x10 beams.