The framing begins at our Kusa Room Addition. 2x10 floor joists are installed 16" on center to support the 3/4 " Advantech flooring panels. Advantech sub floors are both stronger and more weather resistant than either plywood or osb floors, and offer a 50 year warranty.
The floor panels are glued and nailed to the joists to avoid floor squeaks.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment