Framing Begins on Kusa Room Addition

The framing begins at our Kusa Room Addition. 2x10 floor joists are installed 16" on center to support the 3/4 " Advantech flooring panels. Advantech sub floors are both stronger and more weather resistant than either plywood or osb floors, and offer a 50 year warranty.

The floor panels are glued and nailed to the joists to avoid floor squeaks.

The walls on this project are built with 2x4 studs and 7/16 osb sheathing, which is typical for residential construction.






No comments: